Abstract: The information on the requirements for the installation of intelligent vortex flowmeters is provided by excellent flowmeter and flowmeter manufacturers. The intelligent vortex flowmeter can bring temperature and pressure compensation, measure the flow of steam, and is easy to install. The following are some points of attention on its installation. 1. Reasonable selection of installation site and environment Avoid strong power equipment, high frequency equipment, and strong power switch equipment. More flowmeter manufacturers choose models and price quotations. You are welcome to inquire. The following are the details of the requirements for the installation of intelligent vortex flowmeters. The intelligent vortex flowmeter can take temperature and pressure compensation, measure the flow of steam, and is easy to install. The following are some points to pay attention to in the installation. 1. Reasonably choose the installation site and environment to avoid strong power equipment, high frequency equipment, and strong power switch equipment; avoid the influence of high temperature heat sources and radiation sources, avoid strong vibration places and strong corrosive environments, etc., and consider the convenience of installation and maintenance. . 2. There must be enough straight pipe sections upstream and downstream If the upstream of the sensor installation point has two 90s on the same plane. Elbow, then: upstream straight pipe section≥25D, downstream straight pipe section≥5D. If there are two 90s in different planes upstream of the sensor mounting point. Elbow, then: upstream straight pipe section≥40D, downstream straight pipe section≥5D. The regulating valve should be installed beyond 5D downstream of the sensor. If it must be installed upstream of the sensor, the upstream straight pipe section of the sensor should not be less than 50D, and the downstream should not be less than 5D. 3. The piping upstream and downstream of the installation point should be concentric with the sensor, and the coaxial deviation should not be less than half the pipe diameter. 4. Vibration reduction measures for pipelines Sensors should be installed on pipelines with strong vibrations, especially lateral vibrations, as far as possible. If the installation is unavoidable, vibration reduction measures must be taken, and pipe fastening devices and anti-vibration pads should be installed at the upstream and downstream 2D of the sensor. Fifth, the installation on the horizontal pipeline is the most commonly used installation method of the flow sensor. When measuring gas flow, if the measured gas contains a small amount of liquid, the sensor should be installed at a higher part of the pipeline. When measuring liquid flow, if the measured liquid contains a small amount of gas, the sensor should be installed at the lower part of the pipeline. Sixth, the installation of the sensor in the vertical pipeline When measuring the gas flow, the sensor can be installed on the vertical pipeline, and the flow direction is not limited. If the measured gas contains a small amount of liquid, the gas flow should be from bottom to top. When measuring liquid flow, the liquid flow direction should be from bottom to top, so as not to add extra liquid weight to the probe. Therefore, whether it is the selection of the environment or the installation of the pipeline, there are certain requirements. Only when the installation requirements are met, the safe and normal use of the instrument can be ensured. The above is the whole content of this article. You are welcome to inquire about the flowmeter selection and quotation of our factory. 'Requirements for the Installation of Intelligent Vortex Flow Meters'
Beijing Sincerity Automatic Equipment Co., Ltd will continue to build a corporate culture that respects and values the unique strengths and cultural differences of our associates, customers and community.
Grab great deals to buy at Beijing Sincerity Automatic Equipment Co., Ltd. Visit us today on Sincerity Flow Meter.
Beijing Sincerity Automatic Equipment Co., Ltd believes that the average profitability will be sufficient.
Quick Links
Contact Us
● Add:No. 8 building, 3rd. district,I-Town, Gaoli Zhang
road,Haidian District, Beijing, China 100095
● Contact :Zoe Pan
Skype: testifypp
● Mobile:+86 13601110505
● Whatsapp : +86 18600270515
● Email:info@bjsincerity.com